Controle de poços

336 palavras 2 páginas
TRANSOCEAN SS-50

Illustrative image.

BACIA DE CAMPOS,JANEIRO DE 2013

* GENERAL INFORMATIONS
This report is result of the job done in JANUARY 2013 on board of ‘TRANSOCEAN DRILLER SS-50’
HERE YOU MUST WRITE IN FORM OF TOPICS OR TEXT A BRIEF SUMMARY OF WORK PERFORMED.
Here some details about the job on board::
Client: TRANSOCEAN DRILLER
Rig: SS-50
Location: Bacia de Campos
Started on: 04/01/2013
Finished on: 15 / 01 / 2013
Performed by: Electrical technician:: VICENTE BALBINO Electrical technician:: KLEBER JOSE *

________________________________________________ _________________________________________ Technician responsible: KLEBER JOSE TRNSOCEAN- Person in charge Lifting Assistência Técnica, Elétrica e Comercial Ltda (Signature and stamp) DAILY REPORT OF THE JOBS PERFORMED | AREA/PLATAFORM LOCAL:TRANSOCEAN DRILLER | DATE:15/01/2013 | JOB DESCRIPTION: | BEFORE | AFTER | PHOTO 01 | JB ANODO-01 BORESTE | PHOTO 02 | JB ANODO-01 | ‘ | PHOTO 03 | JB ANODO-01 | PHOTO 04 | CONEXAOANODO-01 | | JOB DESCRIPTION | | | | DAILY REPORT OF THE JOBS PERFORMED | AREA/PLATAFORM LOCAL: | DATE: | PHOTO 05 | DESCRIPTION | | JB ANODO-02 | PHOTO 06 PHOTO 07 | JB ANODO-03 | | CONEXAO ANODO-03 | DAILY REPORT OF THE

Relacionados

  • Controle de poço
    4717 palavras | 19 páginas
  • Controle de poços
    6465 palavras | 26 páginas
  • Controle de poço
    7316 palavras | 30 páginas
  • Controle de pocos
    3548 palavras | 15 páginas
  • Simulação de controle de poços
    2626 palavras | 11 páginas
  • Tec BlowOut
    21580 palavras | 87 páginas
  • introdução a barreira de segurança de poço
    3190 palavras | 13 páginas
  • Artigo TCC I
    3354 palavras | 14 páginas
  • arvore de natal molhada
    2318 palavras | 10 páginas
  • Critica Da Monografia
    570 palavras | 3 páginas