retgergv

293 palavras 2 páginas
2.54

1.07

3.45

3.65

4.69

4.60

4.61

1.18

1.50

1.80

1

2

3

11

4

12

5

6

7

8

10

9

13

Vb.1

P.1

20/35

2.30

Vb.16

20/35

P.2

P.3

Vb.2

A

P.4

P.5

P.6

P.7

20/35

2.80

Vb.21

20/35

P.9

P.8
B

P.10

Vb.3

2.23

20/35

P.11

P.13

P.12

1.73

C

Vb.4
20/3
5

P.14

4.95

P.15
Vb.5

000

20/3
5

P.17

P.16

P.18

P.20

P.19

7.74

D

20/3
5

P.21
E

viga invertida ou normal

Vb.22

V.000 inv

segue

20/35

20/35

20/35

Vb.20

nasce
Vb.19

3.23

Vb.1

5

PILARES

00/00

morre

Vb.6

da viga

da viga

P.22
Vb.7
F

20/3

P.23

P.24

P.25

5

20/35

Vb.18

1.80

20/35

CA-50A
Vb.8

P.26

P.27

P.28

P.29

CONFERIR QUANTIDADES - COLOCAR SOBRA
#
peso (kg) compr (m) barras (12m)

P.30

20/35

X

X

X

6.3

X

X

X

8

X

X

X

10

X

X

X

12.5

X

X

X

16

X

X

X

20

X

X

X

Vb.17

20/35

Vb.14

20/35

20/35

2 20/3
Vb.1

Vb.13

20/3
5

Vb.1

1

3.11

5

5

Vb.9

G

total

X

CONCRETO:

20/35

1.83

fck=24MPa
P.31

Vb.10

H

P.32

P.33

P.34

P.35

P.36

P.37

P.38

Vc (laje)= XXm3
Vc (blocos/baldrames)= XXm3
Vc (estacas)= XXm3
Formas= XXm2

NOTAS :

20/35

2) VERIFICAR RECUOS - CHECAR COM PLANTA DE ARQUITETURA
DOS AUTORES DO PROJETO PARAR OBRA E AVISAR O PROJETISTA.
4) MEDIDAS EM METROS, COTADAS NOS EIXOS.
5) PROJETO COM BASE NOS DESENHOS DE ARQUITETURA FORNECIDOS
AS DO PROJETO EXECUTIVO

PARAR OBRA E AVISAR O PROJETISTA.

8) NOTAS DA ESTRUTURA
- nos arrimos se houver, blocos com 4,5MPa grauteados

- acompanhar e checar todos os procedimentos.
- se escavada, concretar o furo no mesmo dia
Vigas e lajes

- concretar simultaneamente (engastar)
- desformar do centro para os apoios

Relacionados