DORIS PROJETO N. º: 62047 NOME DO PROJETO: Yucal Placer Phase 300

DATA DO RELATÓRIO: 12.09.13 RELATÓRIO N º: 005

P.O. NO/SUPPLEMENT: YP/C/PR/872-012 INSPETOR: Leonardo Moreira Da Silva DORIS PO No. 4500014330

FORNECEDOR: GEA do Brazil Intercambiadors Ltda

 PRIME  SUB (IF SUB, NAME PRIME)   LOCALIZAÇÃO DO FORNECEDOR: Franco da Rocha, SP, Brazil

NOME DE CONTATO: Michelle Zago – michelle.zago@gea.com REFERÊNCIA DE LOJA: YPP-30-11-103-V

TELEFONE NO.: +55-11-4447-8812 FAX NO.: +55-11-4447-8810

ORDER:  COMPLETE  INCOMPLETE ESTIMATED NUMBER OF INSPECTION VISITS TO FOLLOW: 13 ITP Points

INSPECTION DATE: 12.02.13 to 12.06.13 NEXT VISIT DATE: TBD

P.O. DELIVERY DATE: 12.09.13 CURRENT PROMISED DELIVERY DATE: 12.09.13

ITEM NO.
DESCRIÇÃO DE MATERIAL (ORDEM PRINCIPAL)
STATUS DO PEDIDO
%
DATA DA PROMESSA
4
Inlet Air Cooler – Tag No. 11-A-0120
(GEA Project No. 25/13.007-01)

5
Stabilized Condensate Air Cooler – Tag No. 11-A-2040
(GEA Project No. 25/13.007-02)
ENGINEERING
 
 
6
Produced Water Air Cooler – Tag No. 11-A-0680
(GEA Project No. 25/13.019-01)

 
 
MATERIALS
 
 
 
 

 
 
FABRICATION
 
 
 
 

SUBSUPPLIERS ASSOCIATED WITH SUPPLIER
LOCATION
REF. NO.
BRIEF DESCRIPTION
 
 
 
 
 
 
 
 
 
 
 
 
ATTACHMENTS:
 NONCONFORMANCE REPORTS
TYPE OF INSPECTION OR ACTIVITY

 INSPECTION RELEASE REPORTS

IN-PROCESS

TESTING

 FINAL INSPECTION CHECKLIST

FINAL

OTHER  

 INSPECTION CLOSE OUT REPORT

 OTHER  

ATTACHMENTS SENT BY MAIL:
 

1. INTRODUÇÃO:
1.1. O objetivo da visita de inspeção foi testemunhar a montagem final dos cabeçotes e estrutura, assim como acompanhar os Testes