DORIS PROJETO N. º: 62047 NOME DO PROJETO: Yucal Placer Phase 300DATA DO RELATÓRIO: 12.09.13 RELATÓRIO N º: 005
P.O. NO/SUPPLEMENT: YP/C/PR/872-012 INSPETOR: Leonardo Moreira Da Silva DORIS PO No. 4500014330
FORNECEDOR: GEA do Brazil Intercambiadors Ltda
PRIME SUB (IF SUB, NAME PRIME) LOCALIZAÇÃO DO FORNECEDOR: Franco da Rocha, SP, Brazil
NOME DE CONTATO: Michelle Zago – michelle.zago@gea.com REFERÊNCIA DE LOJA: YPP-30-11-103-V
TELEFONE NO.: +55-11-4447-8812 FAX NO.: +55-11-4447-8810
ORDER: COMPLETE INCOMPLETE ESTIMATED NUMBER OF INSPECTION VISITS TO FOLLOW: 13 ITP Points
INSPECTION DATE: 12.02.13 to 12.06.13 NEXT VISIT DATE: TBD
P.O. DELIVERY DATE: 12.09.13 CURRENT PROMISED DELIVERY DATE: 12.09.13
ITEM NO.
DESCRIÇÃO DE MATERIAL (ORDEM PRINCIPAL)
STATUS DO PEDIDO
%
DATA DA PROMESSA
4
Inlet Air Cooler – Tag No. 11-A-0120
(GEA Project No. 25/13.007-01)
5
Stabilized Condensate Air Cooler – Tag No. 11-A-2040
(GEA Project No. 25/13.007-02)
ENGINEERING
6
Produced Water Air Cooler – Tag No. 11-A-0680
(GEA Project No. 25/13.019-01)
MATERIALS
FABRICATION
SUBSUPPLIERS ASSOCIATED WITH SUPPLIER
LOCATION
REF. NO.
BRIEF DESCRIPTION
ATTACHMENTS:
NONCONFORMANCE REPORTS
TYPE OF INSPECTION OR ACTIVITY
INSPECTION RELEASE REPORTS
IN-PROCESS
TESTING
FINAL INSPECTION CHECKLIST
FINAL
OTHER
INSPECTION CLOSE OUT REPORT
OTHER
ATTACHMENTS SENT BY MAIL:
1. INTRODUÇÃO:
1.1. O objetivo da visita de inspeção foi testemunhar a montagem final dos cabeçotes e estrutura, assim como acompanhar os Testes